CE, RoHS and ETL: the certification checklist before your first shipment
Certification work runs in parallel with the sample order. Missing documents delay shipments more often than missing parts do.

Start from the destination market
The document set follows the market, not the factory. A European launch and a North American launch need different test bases, different label artwork and different plug standards, even when the hardware platform is the same.
For Europe, electrical safety and electromagnetic compatibility are addressed through CE marking, with RoHS covering restricted substances and a separate energy label for the appliance. For North America, listings such as ETL or UL apply to the models submitted for evaluation, and the declared performance figures come from the local test procedure.
Prepare the documents early
Test reports, declarations of conformity, label artwork, nameplate data, user manuals and plug certification all feed the same approval chain. Each one takes time, and artwork is usually the item that holds up production because it touches the carton, the label and the manual at once.
- Test report for the exact model and configuration being shipped
- Declaration of conformity with the correct standards and signatory
- Energy label and datasheet matched to the tested configuration
- Nameplate and warning labels in the required languages
- Plug, cord and adapter documentation for the destination market
Keep the platform stable once approved
A change of compressor, refrigerant, control board or housing can invalidate an approval and require re-testing. Programme planning should therefore freeze the certified configuration for the season and treat any engineering change as a new approval rather than a running change.
Where a model is offered in several capacities, buyers should confirm which variants the report covers, because a family approval does not always extend to the largest capacity in the group.